DOAN Workshop

Help

Home
Getting startedTaking 360 photos (crew)Looking at a roomOpen items, drawings, and the 3D modelFor the officeSomething is wrong

Getting started

Sign in
  1. Open sitewalk.doanworkshop.com.
  2. Type your Username and Password, then tap Sign in.
  3. No account yet? Ask the office. They add you and send you a link.
Set up your login from a link
  1. Open the link the office emailed or texted you.
  2. Tap Continue.
  3. Pick a username and a password (at least 8 characters), type the password again, and tap Save and continue.

A texted setup link works once, for one day. If it says the link was already used or has expired, ask the office for a new one.

Forgot your password
  1. On the sign-in screen, type your username or email in the Username box.
  2. Tap Forgot your password?, then Send me a link.
  3. Open the email and follow the link to pick a new password.

No email on your account? Ask the office to set a new password for you.

Put SiteWalk on your phone's home screen
  1. Open SiteWalk in Safari on iPhone (or Chrome on Android).
  2. iPhone: tap Share, then Add to Home Screen. Android: tap the menu, then Add to Home screen.
  3. Open SiteWalk from the new icon from now on.

On iPhone this is also what lets SiteWalk send you notifications.

Get a notification when someone tags you
  1. On iPhone, first put SiteWalk on your home screen and open it from there.
  2. On the Projects page, tap Turn on notifications and allow them.
  3. When someone tags you with @ on a pin or note, your phone buzzes. Tap it to open that spot.

If it says notifications are blocked, turn them on for SiteWalk in your phone's Settings.

My work: what is on your list
  1. Home (tap the DOAN logo anywhere) shows My work: everything handed to you and every pin you were tagged on, across all your jobs, soonest first.
  2. Tap an item to open the photo or the room it is about. Tap the circle to mark it done.
  3. To hand work to a teammate: when you save a pin on a photo, pick who under Hand it to and a due date. Or on a job's Open items, tap Assign on a pin, or Add a task for something with no photo.
  4. They get a notification on their phone, and it shows on their Home.

The office sees everyone's open work on Home, by person.

Find your way around
  1. Home (top of the menu, or tap the DOAN logo) shows your work and every job you are on. Tap a job to open its plan.
  2. On a phone, the three lines at the top left open the menu: the places (Home, Meetings, Time off and the rest), your pinned jobs, and the parts of the job you are in. You are at the bottom of it (Help and Sign out are there), next to the one button you use most on that page, like Shoot a walk. Pin a job with the pin on its card on Home, or Pin this job in the menu.
  3. On a computer the top bar has Search and Home, and the round button with your initials is your account. Inside a job its parts are down the left side.
  4. On a job's page, Jump to a room above the plan opens the list of every room. The two big buttons get photos in. Waiting on someone lists what needs a person: photos to place, photos to check, RFIs. Under that are the parts of the job, one line each.
  5. The job menu (This job in the phone menu, the left side on a computer) is the same on every project, in the order the work happens: Overview, Photos (the plan and rooms, walks, 3D model, detail photos), Design (intake, phases, program, selections, spec book, sign-offs), Permits, Build (open items, daily log, checklists, plans), People (messages, clients, subs) and Documents. You only see the pages you can open. For the crew, Design stays in its place, greyed, because the office keeps the design.
  6. The line of stages under the top bar shows where the project stands, from Lead to Warranty, with the current stage dark. Tap a stage to open the part of the project it belongs to. On a phone, slide it sideways to see the rest.
  7. Plans opens the construction drawings straight away, on the sheet you last had open. Documents holds the other drawings, the inspections, and the set subs open from the entrance sign.
  8. The magnifying glass searches pins, notes, rooms, drawings, and files.

Taking 360 photos (crew)

Five minutes a day: walk the rooms in order, shoot each one, and let the phone file the photos.

How we shoot
  1. Stand on the room's mark, with the camera at the same height every time (about 5 feet to the lens; a piece of tape on the pole makes it easy).
  2. Face the room sign so its number shows in the photo.
  3. Step back from the camera and shoot.
  4. Shoot each room in the order they are numbered. That order is the walk.

Same spot and same height every visit is what makes photos from different days line up.

Shoot a walk (records which room you are in)
  1. Open the job and tap Shoot a walk.
  2. The orange room is the one you are in. Tap another room to change it.
  3. Tap Show sign to put the room number big on your phone, and hold the phone in front of the camera's front lens as you shoot. Tap Next to go to the next room.
  4. While a room is orange here, SiteWalk notes the time. You can shoot with the Insta360 app meanwhile; Add walk photos later files those photos by that time.
  5. Add photo on this screen files the photos you pick to the orange room (and the next rooms, in walk order), not by time. To use it, add each room's photo before you move on.
  6. Tap Finish walk when you are done, then use Add walk photos to add all the walk's photos at once.
Add walk photos (all of a walk's photos at once)
  1. Open the job and tap Add walk photos.
  2. Tap Pick photos and choose every photo from the walk.
  3. Each photo is filed by the room that was orange in Shoot a walk when it was taken, or else by reading the room sign in it. For any that say Which room?, pick the room yourself.
  4. Check the room on every photo before saving.
  5. Photos already in SiteWalk are skipped (they say Already uploaded). Tap Upload it anyway only if it really is a new photo.
  6. Tap Save, which shows the count, like Save 3 photos. They upload in the background.
Add a photo to one room
  1. Open the room.
  2. Tap Add photo, on the bar under the photo.
  3. Pick the photo. It is saved on your phone and uploads in the background.
Save a job for offline
  1. With signal, open the job and tap the cloud button at the top, then Save to this phone. Wait until it says Saved on this phone.
  2. With no signal, the job, its floor plan and Documents (drawings), Shoot a walk, Add walk photos, and Open items open from your phone. A dark strip at the top says it is the copy saved on this phone, and when.
  3. Partly saved means some items did not come through. Tap Update the saved copy with better signal.
  4. Tap Update the saved copy now and then, so it has the newest drawings.

360 photos are not saved to the phone; they are too big. Notes and checking off items still need signal. On iPhone, add SiteWalk to the Home Screen so the phone keeps the saved copy.

No signal on site
  1. Before you go, save the job for offline (see Save a job for offline). Then Shoot a walk and Add walk photos open with no signal.
  2. In Add walk photos, pick your photos and tap Save. They are kept on your phone once it says they are saved on your phone.
  3. Adding a photo to one room saves it as soon as you pick it.
  4. An orange bar at the bottom says how many photos are waiting for signal.
  5. When you get signal, they send on their own. Keep the app open until the bar clears.

Do not delete photos from the camera until the bar is gone.

Looking at a room

Look around and change the date
  1. Drag to look around. Pinch or scroll to zoom.
  2. The date at the top is the photo you are seeing. Use the arrows for older and newer, or tap the date to pick from the list.
  3. Tap the corners button (top right) for Just the photo; tap it again to bring the tools back.
  4. The chevron above the tools at the bottom hides or shows them.
Zoom the small plan, and get back to the job
  1. On a computer, put the pointer over the small plan and roll the wheel to zoom in and out. The photo behind it stays still. Drag the plan to move around.
  2. On a phone, use the minus and plus buttons under the small plan, and drag it with a finger.
  3. The zoom goes back to normal when you move to another room.
  4. To go back to the job from any room, tap the job's name at the top left, next to the arrow. The arrow goes back one step, which can be the room you were just in.
Go to the next room
  1. Tap an orange arrow in the photo to step into that room. If more than one room lies that way, it asks Which room?; tap the one you want.
  2. Or tap a black dot on the small plan (top right). Its corner buttons make it bigger, or tuck it away.
  3. Tap a room on the plan to open its newest 360. The orange arrows on the floor step into the rooms next door; the tools mark it up, add notes, and scrub back through the dates, all on the same screen.
  4. The arrows on the floor of a 360 walk you room to room through the newest photos; the arrows beside the room name step through the rooms in order.
Compare two dates
  1. In a room with two or more photos, tap Compare.
  2. Pick the second date at the top of each side. Both sides turn together.
  3. Tap Close to go back.
Looking around as a guest
  1. Signed in as the guest, you see the jobs DOAN Workshop has opened to guests. Look around the rooms, tap the pins, scrub the dates, walk through, open the plans, the drawings and the detail photos.
  2. A guest can look at everything shown and change nothing.
  3. Want SiteWalk for your own jobs? Ask DOAN Workshop.
Pin a problem on a photo
  1. Tap Pin, then tap the spot in the photo.
  2. Type what is there, or tap Take a close-up and take a picture of it. A pin can be just the picture. Type @ and a name to tag someone; they are told.
  3. Tap Save pin. It shows in the room's notes and in Open items. To move it later, tap the pin in the list, then Move, then the new spot.

No signal? A pin with a close-up is saved on the phone and sends on its own when signal is back. Add or replace a close-up later with the camera button on the pin.

Close a pin when it is fixed
  1. Tap the round button next to the pin (in the room's notes or in Open items).
  2. It moves to Done. Tap it again to reopen.
Add a note to a photo
  1. Open the notes (on a phone, tap Notes on the photo).
  2. Type in Add a note and tap Save. Type @ and a name to tag someone.
Photos: detail shots of a room
  1. On the job, tap Photos. Every regular photo on the job is there, newest first, by day: the crew's detail shots and the ones subs sent from the sign. Filter by room, or by Crew or Subs.
  2. Tap Take or add a photo, pick the room, then use the camera or the camera roll. No signal? The photo waits on the phone and sends when signal is back.
  3. Open a photo to add a note, change its room, or Mark up (pen, arrow, box, text). Removed photos are hidden, not deleted.
  4. To put it on the 360: open the photo, tap Attach to a spot on the 360, look around, tap the spot, and save the mark. The photo shows on that mark, markup and all.
  5. Several pictures on one spot, such as renderings of the same wall as options: attach the first as above, then for each next one tap the existing pin instead of an empty spot. The pin then shows arrows to move between them, with each photo's note as its caption.

A 360 is the whole room; a photo is the detail. Attach the detail to the spot so the office finds it from either side.

Clients: sign in to see your project
  1. Go to sitewalk.doanworkshop.com/login and type the email DOAN Workshop has for you. It is the same sign-in page the DOAN team uses.
  2. The first time, open the email and tap the button, or type the code from it. You are then asked to pick a password. After that, sign in with your email and your password.
  3. You see your project's 360 photos by room and date, and the items DOAN is working on. Tap a pin on the plan or an arrow in a photo to move room to room.

Not on a project yet? Ask your contact at DOAN Workshop to add you.

Clients: ask for work on your project
  1. Sign in to your project and tap Requests, then fill in what needs attention, the room if you know it, and how to reach you. Add photos if it helps. Tap Send.
  2. You get a request number right away. No signal? It waits on your phone and sends when you tap Send again with signal.
  3. DOAN looks at every request and tells you whether it is covered. Replies and visit times show on the request, and you get an email when we reply.
  4. When we mark the work completed, tap Yes, it is done, or write back if it is not.
  5. Your Warranty tab shows what is covered and until when, with the same four steps and an Open Requests button, so a warranty request is never a phone call that gets lost.

Send it whatever the warranty dates say. We decide coverage after we look.

Photos before the plan has pins (existing conditions)
  1. A remodel starts before the plan is drawn. Shoot the 360s anyway and drop them on the job page (or tap Add walk photos); with no pins, every photo is saved as unplaced.
  2. Unplaced photos open in the same viewer as a room: dates, marks, notes. Find them on the job page (the note at the top) or in the menu.
  3. Once the plan has pins, open an unplaced photo and tap Place, then pick its pin. The photo, its marks and its notes move to that room and stay in its history.
  4. Shoot in a steady loop (front door, then clockwise, every room) so placing later is quick.
Line up a photo with the room's drawings
  1. Open the room (it needs two or more photos) and tap Line up.
  2. Drag the slider until the cone on the small plan points the way you are looking and the drawings sit on the right walls. The arrows turn with it. The number shows how far the photo is turned.
  3. Tap Save. Marks stay where they were made.
See the 3D model from this spot
  1. Tap Model. The model shows from this pin, turned the same way as the photo.
  2. Tap Overlay on photo and slide between Photo and Model to see both.
  3. Pick Quality: Fast is quicker and lighter on battery; High adds outlines and shadows.
  4. Tap Measure, then two points, to measure a distance.

The model shows only after the office has lined it up with the plan.

Open items, drawings, and the 3D model

The punch list (Open items)
  1. Open the job and tap Open items.
  2. Filter by room, and by Open, Done, or All.
  3. Tap an item to open its photo turned to the mark. Tap the round button to mark it done.
Open the construction drawings (Plans)
  1. Open the job and tap Plans. The current set opens straight away, on the sheet you last had open on this phone.
  2. Pick a sheet by its number from the list at the top (A1.0, A2.1), or flip with the arrows.
  3. From a room's 360, tap Plans. Back brings you to the same room.
  4. The list at the top of the viewer names every set with the day it came in, newest first: permit submittals, revisions, updates. Current sets come first, older ones under Older; pick one to open it. All sets (Manage for the office) shows the same list as cards with Open on each.
  5. Office: tap Manage to add a new set (drop the PDF or pick it) or to mark a set as older or current. Moving, splitting and removing drawings stay under Documents.

Plans is for the construction drawings. Shop drawings, cut sheets, elevations and renderings live under Documents.

Add and open drawings
  1. Open the job and tap Documents. Drawings is the first tab.
  2. Tap Add drawings, pick the files, choose the Room and Type, and tap Upload (it shows the count, like Upload 2 files).
  3. Open a drawing to view it. A PDF keeps all its pages; flip them in the viewer.
  4. To pin a drawing to a wall: open the room, tap Pin a drawing, tap the wall, and choose the file.
Mark up a drawing
  1. Open the drawing. It opens on Move: drag with one finger to look around, pinch with two to zoom. Nothing is drawn on Move.
  2. Pick a tool at the top: Pen, Highlight, Text, Symbols (the legend: receptacles, switches, drains, diffusers), or Erase. On a phone, tap More for Arrow, Box, Circle, Line, colors, and thickness; on a wider screen they are all there.
  3. Draw with one finger. Putting a second finger down cancels the stroke. Undo and Redo are at the top.
  4. Marks save on their own: the top says Saved, Saving, or Waiting to send. With no signal they wait on this phone: keep the drawing open, or reopen the same drawing when you have signal, and wait for Saved before counting on others seeing them. If it says Not saved, follow the warning before closing.
  5. Erase removes a mark for everyone but keeps a record of who erased it and when. Tap Close when you are done.
  6. For the office, on a computer with a mouse, a key picks the tool: V Move, P Pen, H Highlight, T Text, E Erase, A Arrow, R Box, O Circle, L Line. [ and ] make the line thinner or thicker. Ctrl+Z is Undo, Ctrl+Y is Redo, and Esc goes back to Move. The keys do nothing while you are typing.

You can mark up drawings you posted. The office can mark up any drawing. Everyone on the job sees the marks.

Inspections: what is passed, failed, or still to come
  1. Open the job, tap Documents, then Inspections.
  2. Each inspection shows Passed, Failed, Scheduled, or Not scheduled, with its last date and inspector.
  3. Tap one to see every result on file and its report or tag, plus the corrections the inspector asked for.
  4. To add a correction: open the room photo, tap Mark, and pick the inspection. It shows here as an open correction.

Fixing the corrections does not pass the inspection. The office records the re-inspection when it passes.

Checklists: meetings and our checks before each inspection
  1. Open the job and tap Checklists.
  2. Meetings are the ones we run with the client and the subs: the preconstruction meeting and the electrical box walk-through. The office starts them and pulls them up at the meeting.
  3. Our checks are for DOAN only, never the client: underground plumbing, wall cover, drywall tape and float, above-ceiling, finals, and turnover. Anyone on the job can start one.
  4. Tap a checklist, then tap OK, Fix, or Not needed on each line. Tap it again to clear it. Add a note to say what needs fixing.
  5. No signal? Keep going. Your taps are kept on the phone and sent when signal is back.
  6. The office can add a line for this job, remove a line, and write the date, who came, and who signed off on a meeting.

Do the check before you call for the inspection. Anything marked Fix still counts as left to do.

The set subs open from the entrance sign
  1. Open the job, tap Documents, then Shared with subs.
  2. This is the same list subs see when they scan the entrance sign: the current plans and files.
  3. Add or remove files from Subs, Plans and files. Print the sign from Set up.
Look around the 3D model
  1. Open the job and tap 3D model.
  2. Look: drag to turn, pinch to zoom. Recenter brings it back.
  3. Walk: see it at eye height. On a computer, W A S D walks.
  4. Tap a room on the small plan to open that room with the model showing.
  5. Quality: Auto picks for your device; Fast is smoother on phones; High is sharper.

If the model looks washed out, try High on a computer. On a phone, Fast keeps it smooth.

For the office

Admin tools. Crew do not see these.

Meetings: agenda and action items
  1. Before the huddle: tap Meetings in the menu, then New meeting. Pick the date and tap Start the meeting. The page shows what is still open from earlier meetings and who is out this week.
  2. After the huddle: paste the notes into Notes and tap Pull out the action items. Claude drafts a list of who does what by when. Or tap Add an item and type them.
  3. Check each draft: Change the wording, who, the job or the date; Drop what is not needed. The owner taps Approve. An approved item with a job becomes a task on that person's list on Home; one with no job stays on the meeting as a general item.
  4. Mark done on Home for a task, or on the meeting for a general item. Anything still open carries into the next meeting by itself.
Ask for time off
  1. Tap Time off in the menu. The top shows your days left for the year with a bar of what is used and waiting, and sick days taken. Coming up lists your next days off and the next company holidays.
  2. Tap Ask for time off, or I am out sick. Pick PTO, Sick or Unpaid, then a quick pick like Tomorrow, This Friday or All of next week, or the first and last day yourself. Half day if it is one, and a note if you like. The screen counts the working days: weekends and company holidays do not count.
  3. Tap Send the request. The owner gets a note on their phone and you get one back here when it is decided. Sick days need no notice; just send it the same morning.
  4. Asked for more than you have left? It tells you, and one more tap sends it with the rest as unpaid, as the policy says.
  5. Changed your mind? Tap Take it back on your request, any time while it is waiting, or before it starts once approved.
  6. Home shows who is out this week, names and dates only.

The office has a Calendar tab: a month of who is out, waiting requests dashed. The owner approves, sets each person's numbers for the year under Everyone's numbers, and keeps the holiday list. Carried-over days are set there each January.

Sketch on a 360 photo
  1. Open the room's 360 and turn it to what you want to draw on. Zoom in if you like.
  2. Tap Sketch, next to Pin. It takes a picture of exactly what is on screen, with no buttons in it, and opens the drawing tools.
  3. Draw, add arrows, boxes or words, then Save markup. The sketch is saved as a pin on that 360, right where you were looking, with the drawn-over picture as its close-up.
  4. Tap Symbols for the legend: Architectural, Electrical, Plumbing and HVAC. Pick one (receptacle, switch, floor drain, supply diffuser...), set its size or turn it, then tap where it goes. The ones you use most sit under Recent. The same tray is in Mark up on a drawing.
  5. Later, open the pin to see the sketch, tap Mark up to draw more, or change the pin's words from Sketch to what it is about.

Something is wrong

Photos did not send
  1. Go where there is better signal and tap Try again on the bar at the bottom.
  2. Keep the app open until the bar clears.
  3. Tap Remove only if you still have the photos on the camera; you can add them again later.
A photo is in the wrong room
  1. Ask the office to Re-file it. Its marks and notes move with it.
  2. Next time, tap Show sign on the walk, or make sure the room sign is in the photo.
The photo is flat or looks like two circles
  1. It may be the camera's unstitched file, or a flat export of the shot.
  2. In the Insta360 app, open the original 360 shot, export it as a 360 photo, and add that one.
  3. An ordinary flat photo cannot be turned into a 360.

Your phone's Photos app may show a good 360 export as a flat picture; that is normal.

The arrows point the wrong way
  1. The room's direction is not set yet. Ask the office to set Direction on that room.
The 3D model is slow or hard to read
  1. Pick Fast under Quality for a smoother model on a phone.
  2. On a computer, pick High for outlines and shadows.
Cannot sign in, or the link does not work
  1. Check the username and password; tap Show to see what you typed.
  2. Tap Forgot your password? to get a new link by email.
  3. A link that says it was already used or expired: a client taps Email me a new link and types their email; a new one comes right away. Staff ask the office for a new one.
Cannot find something
  1. Tap the magnifying glass and type a word from the mark, room, drawing, or file.
  2. Inside a job, switch between This project and All projects.
A page says something went wrong
  1. Tap Try again.
  2. If it keeps happening, tell the office what you were doing and on which page.

Still stuck?

Tell the office what you were doing, on which job and which screen. A screenshot helps.